by Adminropepro | Sep 13, 2016 | Uncategorized
Ropepro assisted Mentor HR and Little Creatures during a recent shut down period to safely access vessels and confined spaces at their Geelong Brewery site. Maintenance within vessels was required during this shutdown and as such rescue capability was required. When...
by Adminropepro | Aug 9, 2016 | Uncategorized
With the full force of a Melbourne winter bearing down on us it is unsurprising some of the cities buildings are not coping with the volume of rain we have been experiencing. Blocked Gutters, downpipes and Rain Heads can cause significant damage to a building both...
by Adminropepro | Aug 9, 2016 | Uncategorized
Structures and buildings of any shape and size often present challenges to the people who manage them. One of the unique challenges that Building and Structure owners/managers face is the presence of unwanted birds living in or on top of their assets. Bird problems...
by Adminropepro | Jul 6, 2016 | Uncategorized
Ropepro are pictured here conducting Ultrasonic Thickness Testing at an Industrial Manufacturing site in the Geelong region to measure steel thickness of Silo’s. To safely access all areas of the tops of these Silo’s for testing we were required to remove...
by Adminropepro | Jun 7, 2016 | Uncategorized
Ropepro assisted A-Class Bird Control to install Australia’s largest single piece bird net at The University Hospital Geelong. The University Hospital, Geelong has recently undergone major re-development to upgrade its facilities. As part of this upgrade it was...
by Adminropepro | Jun 7, 2016 | Uncategorized
Ropepro recently assisted Woods Environmental Services with a revegetation project for Melbourne Water along the Merri Creek in Melbourne’s inner North. It’s not only vertical works that require the utilisation of Rope access systems, sometimes an area...