by Adminropepro | Aug 3, 2017 | Uncategorized
Ropepro were pleased to assist Senvion during their recent project at Noshiro Wind Farm in Akita Prefecture, Japan. Ropepro were engaged to provide Supervision during recent Rotor Blade repairs. Adequate Supervision of Rope Access works is critical to a...
by Adminropepro | Aug 3, 2017 | Uncategorized
Cast Iron Down pipes and Rain Heads are a predominant feature on older buildings across Australia. These features, although they are often strong and robust, are difficult to maintain as they age and deteriorate, particularly if they are located in difficult to reach...
by Adminropepro | Jul 6, 2017 | Uncategorized
Ropepro were pleased to assist Brooks Marchant Pty Ltd and Icon Water with the replacement of a Tilt Sensor on the Cotter Dam Primary Spillway on the outskirts of Canberra recently. This project presented a number of unique challenges to overcome in order to carry out...
by Adminropepro | Jul 4, 2017 | Uncategorized
Ropepro were pleased to assist Museums Victoria recently with the replacement of a glass panel on the main entrance glass curtain wall. Due to the weight and location of the affected glass panel the options for lifting the panel and fixing the panel in place were...
by Adminropepro | Jun 10, 2017 | Uncategorized
Ropepro recently assisted the team at AGL Hydro with the internal inspection of the Lower Rubicon Power Station Penstock using Confined Space and Rope Access methods. Working in conjunction with AGL, Ropepro has refined a safe access and retrieval method to safely...